Changzhou Chengxin Metal Products Co., Ltd
Email
Follow
Search
Home » En 10305-1 E195 Cold Drawn Seamless Precision Tube
En 10305-1 E195 Cold Drawn Seamless Precision Tube
En 10305-1 E195 Cold Drawn Seamless Precision Tube

En 10305-1 E195 Cold Drawn Seamless Precision Tube

Precision steel tube is a kind of cold drawn or cold rolled steel tube with special surface quality or very tight size tolerance, and it is always customized.
Quantity:
Inquire

Product Description

1. Description: Precision steel tube is a kind of cold drawn or cold rolled steel tube with special surface quality or very tight size tolerance, and it is always customized.

2. Commodity: EN 10305-1 E195 Cold drawn seamless precision tube

3. Size range: 60mm-325mm with ID upto 300mm or W.T upto 50mm.

4. Standard specification & steel grade:

EN 10305-1 E195, E235, E355, C45E, 25CrMo4, 34CrMo4, 42CrMo4,
ASTM A519 1010, 1020, 1026, 1045, 1518, 1524, 1541, 4130, 4140, 4145, 4340, 8620
DIN 2391-2 ST35, ST45, ST52, ST52.3, ST52.4
JIS STKM 13A, STKM 13B, STKM 13C
GB 10#, 20#, 45#, 20CrMo, 30CrMo, 35CrMo, 42CrMo

5. Manufacture method: hydraulic cold drawn

6. Delivery condition:

BK BKW BKS GBK NBK
+C +LC +SR +A +N
Cold rolled Cold drawn Stress relieved Annealed Normalized

7. End finish: plain ends with square cuts, free of burrs.

8. Marking: as per request

9. Standard export packing: in bundles tied with steel strips. Int & ext oil coating. External packing by PVC bags and knit bags.

10. Customized packing and marking are available upon request.

 

 

 

FAQ

1. MOQ: Generally, Min Order Quantity can be 1 ton/size.

2. Delivery Time: Generally, our delivery time is around 20-35 days depending on availability of raw material.

3. Warranty & Guarantee: Warranty & guarantee period is 6 months since we deliver the tubes, and we are not responsible for quality problem caused by wrong unloading or storage after shipment. We welcome customer’s inspection before shipment.

4. Payment Method: We accept payment method like T/T, L/C, or D/P, but it depends on our investigation about customers. We have a solution to evaluate the credit of customers from all over the world, and time and amount of D/P we can release is determined by the evaluation.

5. Quality Control: 90% of the tubes are made from hot rolled seamless pipes. So, quality of raw material determined quality of finished tubes. We purchase raw material from stable suppliers who are leading steel mills, and we inspect the raw material as per the specifications. During our production procedure, there is inspection and quality control in every stage.

 

Company Introduction

We are a manufacturer of cold drawn and honed or skived & roller burnished seamless tubes for hydraulic cylinder barrels. We have facilities covering pickling, cold drawing, heat treating, straightening, automatic saw cutting, non destructive detection, honing and skiving & roller burnishing, OD machining, OD polishing, CNC turning, etc.

 

What We Offer

Quality Raw Material

We use high quality raw material from leading manufacturers.

Strict Quality Control

Strict quality control before, during and after production. Any quality dispute or problem will be immediately reported and handled internally.

Flexible Production Arrangment

To ensure both delivery time and customer experience.

Customization

In addition to steel tube we produce, we also provide services like OD machining, OD polishing, ID honing or skiving&roller burnishing, initial CNC turning.

Packing & delivery

We have established strict quality control circle covering raw material receipt, in-production inspection, and finished product control, and inspection&test records will be kept in our management system.

Packaging

For each piece of tube we delivered, Mill Test Certificate will be issued, and quality guarantee will be given. We give a period of 1-3 months for claim of quality dispute and problems after cargo receipt, depending on actual situation.
View More
Packaging
Delivery
Delivery
Delivery
Delivery

Download

2026-08-25 212
ASTMA512.pdf
PDF
View More
2026-08-25 230
ASTMA519.pdf
PDF
View More
2026-08-25 238
DIN2391-1.pdf
PDF
View More
2026-08-25 268
DIN2391-2.pdf
PDF
View More
2026-08-25 221
EN10305-1.pdf
PDF
View More
2026-08-25 292
Hollow Bar Specifications.pdf
PDF
View More