Changzhou Chengxin Metal Products Co., Ltd
Email
Follow
Search
Home » ASTM A519 SAE AISI 4130 4145 4340 4140 8620 Cold Rolled Cold Drawn Seamless Alloy Steel Mechanical Tubing
ASTM A519 SAE AISI 4130 4145 4340 4140 8620 Cold Rolled Cold Drawn Seamless Alloy Steel Mechanical Tubing
ASTM A519 SAE AISI 4130 4145 4340 4140 8620 Cold Rolled Cold Drawn Seamless Alloy Steel Mechanical Tubing

ASTM A519 SAE AISI 4130 4145 4340 4140 8620 Cold Rolled Cold Drawn Seamless Alloy Steel Mechanical Tubing

Mechanical tubing is a kind of steel tube widely used automotive industry, engineering area, as well as machinery parts. Typical specification of mechanical tubing is ASTM A519, covering carbon steel gardes and alloy steel grades.
Quantity:
Inquire

Product Description

1. Description: Mechanical tubing is a kind of steel tube widely used automotive industry, engineering area, as well as machinery parts. Typical specification of mechanical tubing is ASTM A519, covering carbon steel gardes and alloy steel grades.

2. Commodity: SAE4130 Cold drawn seamless mechanical tubing

3. Standard specification: ASTM A519, BS6323-4, customized specification.

 

4. Available steel grade: Various carbon steel and alloy steel grades including but not limited to the following:

ASTM A519: SAE1010, SAE1020, SAE1026, SAE1045, SAE1518, SAE1524, SAE1541, SAE4130, SAE4140, SAE4145, SAE4340, SAE8620
BS 6323-4: CFS3, CFS4, CFS5, CFS7, CFS8, CFS9, CFS10, CFS11
EN/DIN: ST35, ST45, ST52, E195, E235, E355, C35E, C45E, 25CrMo4, 34CrMo4, 42CrMo4

 

5. Size range:

OD: upto 356mm
ID: upto 300mm
W.T: not limited

 

6. Manufacture method: Cold rolled, Cold drawn, Hydraulic cold drawn

 

7. Delivery Condition:

BK BKW BKS GBK NBK Q+T
+C +LC +SR +A +N
Cold rolled Cold drawn Stress relieved Annealed Normalized Quenched+Tempered

 

8. End finish: plain ends with square cuts, bevelled ends.

9. Standard export packing: in bundles tied with steel strips. Internal and external oil coating. External packing by PVC bags and knit bags.

10. Customized packing or marking are available upon request.

 

 

 

FAQ

1. MOQ: 3-5 tons/size for carbon steel grades, 10-20 tons/size for alloy steel gardes.

2. Delivery Time: 20-30 days for carbon steel mechanical tubings, 30-50 days for alloy steel mechanical tubings.

3. Warranty & Guarantee: Warranty & guarantee period is 6 months since we deliver the tubes, and we are not responsible for quality problem caused by wrong unloading or storage after shipment. We welcome customer’s inspection before shipment.

4. Payment Method: We accept payment method like T/T, L/C, or D/P, but it depends on our investigation about customers. We have a solution to evaluate the credit of customers from all over the world, and time and amount of D/P we can release is determined by the evaluation.

5. Quality Control: We purchase raw material from stable suppliers who are leading steel mills, and we inspect the raw material as per the specifications. During our production procedure, there is inspection and quality control in every stage.

 

Company Profile

We are a manufacturer of cold drawn, cold rolled, and hydraulic cold drawn steel tubes with OD upto 356mm since 2002. Covering an area of about 32000M2, we have 12 standard workshops with 2 hydraulic cold drawing benches, 4 chain cold drawing benches, and 2 ERW mills. Our facilities covers all the production procedures from pickling, cold drawing, heat treating, saw cutting, straightening, inspection, packing to further machining & turning, cold drawing die fabrication, and equipment repairation & maintenance.

 

What We Offer

Quality Raw Material

We use high quality raw material from leading manufacturers.

Strict Quality Control

Strict quality control before, during and after production. Any quality dispute or problem will be immediately reported and handled internally.

Flexible Production Arrangment

To ensure both delivery time and customer experience.

Customization

In addition to steel tube we produce, we also provide services like OD machining, OD polishing, ID honing or skiving&roller burnishing, initial CNC turning.

Packing & delivery

We have established strict quality control circle covering raw material receipt, in-production inspection, and finished product control, and inspection&test records will be kept in our management system.

Packaging

For each piece of tube we delivered, Mill Test Certificate will be issued, and quality guarantee will be given. We give a period of 1-3 months for claim of quality dispute and problems after cargo receipt, depending on actual situation.
View More
Packaging
Delivery
Delivery
Delivery
Delivery

Download

2026-08-25 239
ASTMA512.pdf
PDF
View More
2026-08-25 203
ASTMA519.pdf
PDF
View More
2026-08-25 297
DIN2391-1.pdf
PDF
View More
2026-08-25 249
DIN2391-2.pdf
PDF
View More
2026-08-25 292
EN10305-1.pdf
PDF
View More
2026-08-25 261
Hollow Bar Specifications.pdf
PDF
View More