Changzhou Chengxin Metal Products Co., Ltd
Email
Follow
Search
Home » St52 Seamless Steel Honed Tube for Hydraulic Cylinder Barrel
St52 Seamless Steel Honed Tube for Hydraulic Cylinder Barrel
St52 Seamless Steel Honed Tube for Hydraulic Cylinder Barrel

St52 Seamless Steel Honed Tube for Hydraulic Cylinder Barrel

As a leading seamless honed tube manufacturer, we supply high-strength ST52 honed cylinder tubes engineered for heavy-duty hydraulic barrels. Manufactured from premium ST52 seamless pipe, it ensures ultimate pressure resistance and zero fluid leakage. Material: ST52 / ST52.3 / ST52.4 (DIN 2391 / EN 10305-1) Size Range: ID 30mm–500mm | OD 40mm–580mm Precision: Strict H8 ID Tolerance Surface Roughness: Ra ≤ 0.25 μm (Honed) or ≤ 0.35 μm (SRB) Customization: Every ST52 tube can be cut and CNC machined to your drawings.
Quantity:
Inquire

Product Description

ST52 Honed Cylinder Tube & ST52 Seamless Pipe

1. Overview & Material Properties

As a premier seamless honed tube manufacturer, we engineer precision steel tubes specifically designed for hydraulic cylinder barrels. The ST52 tube (DIN 2391 / DIN 1629 standard, equivalent to E355) is the gold standard in the fluid power industry. Thanks to its low-carbon, high-manganese chemical composition, an ST52 seamless pipe offers outstanding weldability, superior tensile strength (≥ 580 MPa), and excellent machinability.

Whether you need a reliable ST52 honed cylinder tube or custom-machined hydraulic parts, our one-stop manufacturing solutions ensure structural integrity under extreme fluid pressures.

  • Material: ST52.3 / ST52.4 seamless steel
  • Finishing: Honing or Skiving & Roller Burnishing (SRB) for optimal bore quality and H8 tolerance.
  • Additional Services: CNC machining for customized cylinder parts based on client drawings.

2. Commodity Name

ST52.3 / ST52.4 Honed Seamless Tube for Hydraulic Cylinders

3. Size Range

Dimension Parameter Measurement Range
Inner Diameter (ID) 30mm – 500mm
Outer Diameter (OD) 40mm – 580mm
Length Up to 12 meters or customized

4. Available Steel Grades & Equivalents

DIN: ST52, ST52.3, ST52.4 (Core Material)

SAE / AISI: 1020, 1026, 1045, 4130, 4140

EN: E355, C45E, 25CrMo4, 42CrMo4, CK45, S45C, E410, E470

GB: 20#, 45#, 16Mn, Q345B–E, 25Mn, 27SiMn

JIS: STKM 13A, STKM 13C

5. Manufacturing Methods

  • Hydraulic Cold Drawn (Ensures the high density of the ST52 tube)
  • Cold Rolled
  • Hot Rolled + Deep Hole Boring

6. Delivery Conditions

Code (DIN) Code (EN) Condition Description
BK +C Cold drawn (hard)
BKW +LC Cold drawn (soft)
BKS +SR Stress relieved
GBK +A Annealed
NBK +N Normalized
Q+T Q+T Quenched + Tempered

7. Bore Treatment & End Finish

  • Honing: Ra ≤ 0.25 μm (ultra-smooth surface). Ends are plain, square-cut, and burr-free.
  • Skiving & Roller Burnishing (SRB): Ra ≤ 0.35 μm (high efficiency). Slightly beveled ends.
  • Both methods strictly meet the H8 tolerance requirements for hydraulic cylinder barrels. Custom ends are available upon request.

8. H8 Tolerance for ST52 Honed Cylinder Tubes

ID Range (d in mm) Tolerance (mm) ID Range (d in mm) Tolerance (mm)
18 < d ≤ 30 +0 / +0.033 180 < d ≤ 250 +0 / +0.072
30 < d ≤ 50 +0 / +0.039 250 < d ≤ 300 +0 / +0.081
50 < d ≤ 80 +0 / +0.046 300 < d ≤ 315 +0 / +0.081
80 < d ≤ 120 +0 / +0.054 315 < d ≤ 400 +0 / +0.089
120 < d ≤ 180 +0 / +0.063 400 < d ≤ 500 +0 / +0.097

9. Packing & Applications

Our ST52 seamless pipes are securely bundled with steel strips, fitted with plastic end caps, coated with anti-rust oil (internally and externally), and wrapped in PVC or knitted bags. Custom labels are available.

Ideal Applications Include:

  • Hydraulic cylinder barrels (OEM & aftermarket repair)
  • Custom ST52 hydraulic cylinder components
  • High-pressure pneumatic actuators & lifting systems
  • Seamless tube delivery cylinders for concrete pumps

Frequently Asked Questions

Q1: As a seamless honed tube manufacturer, what is your minimum order quantity (MOQ)?

A: Our MOQ is 2–3 tons/size for OD ≤ 250mm, and 10 tons/size for OD > 250mm. For special alloy grades (E410, E470), the MOQ is 10 tons.

Q2: What is the typical delivery time for an ST52 honed cylinder tube?

A: Typical lead time is 40–60 days depending on the size and quantity. Small bore tubes with high precision may take up to 30 days for the honing process alone.

Q3: Do you offer custom cylinder parts from ST52 seamless pipes?

A: Yes, our factory provides complete CNC machining services including turning, boring, and grooving directly from our ST52 tube stock.

Q4: How do you ensure the quality of your ST52 tubes?

A: 90% of our raw materials are sourced from certified major mills. We implement a full-stage inspection protocol encompassing dimensional, surface roughness, and mechanical properties testing.

Company Profile

Founded in 2002, Chengxin is a globally recognized seamless honed tube manufacturer. We operate a 32,000㎡ factory equipped with 12 specialized workshops. Our facility houses advanced hydraulic cold drawing benches, dedicated honing & SRB production lines, and in-house die-making capabilities. We proudly serve hydraulic cylinder OEMs and machinery manufacturers worldwide with premium ST52 seamless pipes and fully customized cylinder parts.

What We Offer

Quality Raw Material

We use high quality raw material from leading manufacturers.

Strict Quality Control

Strict quality control before, during and after production. Any quality dispute or problem will be immediately reported and handled internally.

Flexible Production Arrangment

To ensure both delivery time and customer experience.

Customization

In addition to steel tube we produce, we also provide services like OD machining, OD polishing, ID honing or skiving&roller burnishing, initial CNC turning.

Packing & delivery

We have established strict quality control circle covering raw material receipt, in-production inspection, and finished product control, and inspection&test records will be kept in our management system.

Packaging

For each piece of tube we delivered, Mill Test Certificate will be issued, and quality guarantee will be given. We give a period of 1-3 months for claim of quality dispute and problems after cargo receipt, depending on actual situation.
View More
Packaging
Delivery
Delivery
Delivery
Delivery

Download

2026-08-25 274
ASTMA512.pdf
PDF
View More
2026-08-25 219
ASTMA519.pdf
PDF
View More
2026-08-25 244
DIN2391-1.pdf
PDF
View More
2026-08-25 209
DIN2391-2.pdf
PDF
View More
2026-08-25 272
EN10305-1.pdf
PDF
View More
2026-08-25 289
Hollow Bar Specifications.pdf
PDF
View More