Changzhou Chengxin Metal Products Co., Ltd
Email
Follow
Search
Home » En 10305-1 42CrMo4 Cold Drawn Seamless Precision Alloy Steel Tube
En 10305-1 42CrMo4 Cold Drawn Seamless Precision Alloy Steel Tube
En 10305-1 42CrMo4 Cold Drawn Seamless Precision Alloy Steel Tube

En 10305-1 42CrMo4 Cold Drawn Seamless Precision Alloy Steel Tube

EN 10305-1 42CrMo4 Cold drawn Seamless precision alloy steel tube
Quantity:
Inquire

Product Description

1. Commodity: EN 10305-1 42CrMo4 Cold drawn Seamless precision alloy steel tube

2. Size range: 10mm*1.2mm- 356mm*15mm

 

3. Available steel grade:

SAE/AISI: 1010, 1020, 1026, 1045, 1518, 1524, 1541, 4130, 4140, 4145, 4340, 8620
DIN: ST35, ST45, ST52, ST35.8, ST45.8, 10CrMo910, 13CrMo44
EN:  E195, E235, E355, C45E, E410, E470, 25CrMo4,  34CrMo4, 42CrMo4
JIS: STKM 13A, STKM 13B, STKM 13C
GB: 10#, 20#, 45, #, 16Mn, 25Mn, 30CrMo, 42CrMo, 45CrMo,  40Cr

 

4. Manufacture method: Cold rolled, hydraulic cold drawn, hot rolled+deep hole boring

 

5. Delivery condition:

BK BKW BKS GBK NBK Q+T
+C +LC +SR +A +N
Cold rolled Cold drawn Stress relieved Annealed Normalized Quenched+Tempered

 

6. ID Tolerance: as per request.

7. End finish: Plain ends with square cuts, free of burrs for honed tubes. Little bevelled ends for skived & roller burnished tubes.

8. Standard export packing: In bundles tied with steel strips. Int & ext oil coating. End plastic caps. External packing by PVC bags and knit bags.

9. Customized packing and marking can be provided upon request.

 

 

 

FAQ

1. MOQ: Generally Min Order Quantity can be 2-3 tons/size for tubes with OD below 250mm, and 10 tons/size for tubes with OD above 250mm. Sometimes, it depends on steel grade you need. If you need special grade like E410, E470 or alloy steel tube, MOQ should be 10 tons/size at least.

2. Delivery Time: 20-30 days depending on ordered sizes and quantities.

3. Warranty & Guarantee: Warranty & guarantee period is 6 months since we deliver the tubes, and we are not responsible for quality problem caused by wrong unloading or storage after shipment. We welcome customer’s inspection before shipment.

4. Payment Method: We accept payment method like T/T, L/C, or D/P, but it depends on our investigation about customers. We have a solution to evaluate the credit of customers from all over the world, and time and amount of D/P we can release is determined by the evaluation.

5. Quality Control: 90% of the tubes are made from hot rolled seamless pipes. So, quality of raw material determined quality of finished tubes. We purchase raw material from stable suppliers who are leading steel mills, and we inspect the raw material as per the specifications. During our production procedure, there is inspection and quality control in every stage.

 

Company Profile

We are a manufacturer of cold drawn, cold rolled, and hydraulic cold drawn steel tubes with OD upto 356mm since 2002. Covering an area of about 32000M2, we have 12 standard workshops with 2 hydraulic cold drawing benches, 4 chain cold drawing benches, and 2 ERW mills. Our facilities covers all the production procedures from pickling, cold drawing, heat treating, saw cutting, straightening, inspection, packing to further machining & turning, cold drawing die fabrication, and equipment repairation & maintenance.

 

What We Offer

Quality Raw Material

We use high quality raw material from leading manufacturers.

Strict Quality Control

Strict quality control before, during and after production. Any quality dispute or problem will be immediately reported and handled internally.

Flexible Production Arrangment

To ensure both delivery time and customer experience.

Customization

In addition to steel tube we produce, we also provide services like OD machining, OD polishing, ID honing or skiving&roller burnishing, initial CNC turning.

Packing & delivery

We have established strict quality control circle covering raw material receipt, in-production inspection, and finished product control, and inspection&test records will be kept in our management system.

Packaging

For each piece of tube we delivered, Mill Test Certificate will be issued, and quality guarantee will be given. We give a period of 1-3 months for claim of quality dispute and problems after cargo receipt, depending on actual situation.
View More
Packaging
Delivery
Delivery
Delivery
Delivery

Download

2026-08-25 253
ASTMA512.pdf
PDF
View More
2026-08-25 273
ASTMA519.pdf
PDF
View More
2026-08-25 262
DIN2391-1.pdf
PDF
View More
2026-08-25 270
DIN2391-2.pdf
PDF
View More
2026-08-25 236
EN10305-1.pdf
PDF
View More
2026-08-25 281
Hollow Bar Specifications.pdf
PDF
View More