Changzhou Chengxin Metal Products Co., Ltd
Email
Follow
Search
Home » En 10294-1 E355 Hollow Bar for Machining
En 10294-1 E355 Hollow Bar for Machining
En 10294-1 E355 Hollow Bar for Machining
En 10294-1 E355 Hollow Bar for Machining
En 10294-1 E355 Hollow Bar for Machining
En 10294-1 E355 Hollow Bar for Machining
En 10294-1 E355 Hollow Bar for Machining

En 10294-1 E355 Hollow Bar for Machining

Hollow bar is a kind of thick wall seamless tube or pipe. In Chengxin, we can supply cold drawn hollor bars, hot rolled+deep hole bored hollow bars, and hot rolled or forged+deep hole drilled hollow bars for our customers, and machining & turning service as per drawing is available.
Model: CX‑09
Brand: CHENGXIN
Code: 73049000
Quantity:
Inquire

Product Description

1. Description: Hollow bar is a kind of thick wall seamless tube or pipe. In Chengxin, we can supply cold drawn hollor bars, hot rolled+deep hole bored hollow bars, and hot rolled or forged+deep hole drilled hollow bars for our customers, and machining & turning service as per drawing is available.

2. Commodity: EN 10294-1 E355 carbon steel hollow bar for machining

 

3. Available steel gardes:

ASTM A519: SAE1020, SAE1026, SAE1045, SAE1518, SAE1524, SAE1541, SAE4130, SAE4140, SAE4145, SAE4340, SAE8620
DIN 2391-2: ST45, ST52
EN 10305-1/EN 10294-1 E235, E355, E470, C35E, C45E, 25CrMo4, 34CrMo4, 42CrMo4, E355J2, E470J2, E590K2

 

4. Size range:

OD: 80mm-325mm
W.T: not limited
Length: 2200mm max

 

5. Manufacture method: Hydraulic cold drawn, hot rolled+deep hole boring, hot rolled+deep hole drilling

 

6. Delivery Condition:

BKW BKS GBK NBK Q+T
+LC +SR +A +N
Cold drawn Stress relieved Annealed Normalized Quenched+tempered

 

7. Turning & machining: as per drawing

8. Standard export packing: sea-worthy export packing.

9. Customized packing or marking are available upon request.

 

 

 

FAQ

1. MOQ: 5 tons/size depending on the size.

2. Delivery Time: 30-45 days average.

3. Warranty & Guarantee: Warranty & guarantee period is 6 months since we deliver the tubes, and we are not responsible for quality problem caused by wrong unloading or storage after shipment. We welcome customer’s inspection before shipment.

4. Payment Method: We accept payment method like T/T, L/C, or D/P, but it depends on our investigation about customers. We have a solution to evaluate the credit of customers from all over the world, and time and amount of D/P we can release is determined by the evaluation.

5. Quality Control: We purchase raw material from stable suppliers who are leading steel mills, and we inspect the raw material as per the specifications. During our production procedure, there is inspection and quality control in every stage.

 

Company Profile

We are a manufacturer of cold drawn, cold rolled, and hydraulic cold drawn steel tubes with OD upto 356mm since 2002. Covering an area of about 32000M2, we have 12 standard workshops with 2 hydraulic cold drawing benches, 4 chain cold drawing benches, and 2 ERW mills. Our facilities covers all the production procedures from pickling, cold drawing, heat treating, saw cutting, straightening, inspection, packing to further machining & turning, cold drawing die fabrication, and equipment repairation & maintenance.

 

What We Offer

Quality Raw Material

We use high quality raw material from leading manufacturers.

Strict Quality Control

Strict quality control before, during and after production. Any quality dispute or problem will be immediately reported and handled internally.

Flexible Production Arrangment

To ensure both delivery time and customer experience.

Customization

In addition to steel tube we produce, we also provide services like OD machining, OD polishing, ID honing or skiving&roller burnishing, initial CNC turning.

Packing & delivery

We have established strict quality control circle covering raw material receipt, in-production inspection, and finished product control, and inspection&test records will be kept in our management system.

Packaging

For each piece of tube we delivered, Mill Test Certificate will be issued, and quality guarantee will be given. We give a period of 1-3 months for claim of quality dispute and problems after cargo receipt, depending on actual situation.
View More
Packaging
Delivery
Delivery
Delivery
Delivery

Download

2026-08-25 201
ASTMA512.pdf
PDF
View More
2026-08-25 216
ASTMA519.pdf
PDF
View More
2026-08-25 240
DIN2391-1.pdf
PDF
View More
2026-08-25 201
DIN2391-2.pdf
PDF
View More
2026-08-25 234
EN10305-1.pdf
PDF
View More
2026-08-25 203
Hollow Bar Specifications.pdf
PDF
View More