Changzhou Chengxin Metal Products Co., Ltd
Email
Follow
Search
Home » E355 Concrete Delivery Cylinder or Concrete Pump
E355 Concrete Delivery Cylinder or Concrete Pump
E355 Concrete Delivery Cylinder or Concrete Pump

E355 Concrete Delivery Cylinder or Concrete Pump

Concrete delivery cylinder is a kind of tube parts made from high precision honed tubes through machining & turning. Internal surface of cylinder is hard chrome plated and polished to roughness of Ra0.25um max.
Quantity:
Inquire

Product Description

1. Description: Concrete delivery cylinder is a kind of tube parts made from high precision honed tubes through machining & turning. Internal surface of cylinder is hard chrome plated and polished to roughness of Ra0.25um max.

2. Commodity: ST52 hard chrome plated and honed seamless steel tube

3. Size range: ID of 80mm-280mm

 

4. Available steel grade:

SAE/AISI 1045, 1518, 1524
DIN ST52
EN E355, C45E, CK45

 

5. Manufacture procedure: hard chrome plating, polishing, welding, machining & turning.

6. Thickness of chromed layer: 0.2mm-0.25mm or as per request.

7. Hardness of chromed layer: HV850 min

8. Bore roughness after hard chrome plating: Ra025um max.

9. ID tolernace: +0/+0.1mm

10. Standard export packing: by plywood boxes.

11. Customized packing and marking can be provided upon request.

 

Concrete delivery cylinder: made from cold drawn tubes and painted

Concrete delivery cylinder: made from hot rolled seamless pipes

Concrete delivery cylinder: externally machined surface

Concrete delivery cylinder: welding, turning as per drawing

Concrete delivery cylinder: packing

 

 

 

FAQ

1. MOQ: Generally Min Order Quantity can be 1 piece/size.

2. Delivery Time: Generally, delivery time is around 40-60 days depending on availability of raw material.

3. Warranty & Guarantee: Warranty & guarantee period is 6 months since we deliver the tubes, and we are not responsible for quality problem caused by wrong unloading or storage after shipment. We welcome customer’s inspection before shipment.

4. Payment Method: We accept payment method like T/T, L/C, or D/P, but it depends on our investigation about customers. We have a solution to evaluate the credit of customers from all over the world, and time and amount of D/P we can release is determined by the evaluation.

5. Quality Control: 90% of the tubes are made from hot rolled seamless pipes. So, quality of raw material determined quality of finished tubes. We purchase raw material from stable suppliers who are leading steel mills, and we inspect the raw material as per the specifications. During our production procedure, there is inspection and quality control in every stage.

 

What We Offer

Quality Raw Material

We use high quality raw material from leading manufacturers.

Strict Quality Control

Strict quality control before, during and after production. Any quality dispute or problem will be immediately reported and handled internally.

Flexible Production Arrangment

To ensure both delivery time and customer experience.

Customization

In addition to steel tube we produce, we also provide services like OD machining, OD polishing, ID honing or skiving&roller burnishing, initial CNC turning.

Packing & delivery

We have established strict quality control circle covering raw material receipt, in-production inspection, and finished product control, and inspection&test records will be kept in our management system.

Packaging

For each piece of tube we delivered, Mill Test Certificate will be issued, and quality guarantee will be given. We give a period of 1-3 months for claim of quality dispute and problems after cargo receipt, depending on actual situation.
View More
Packaging
Delivery
Delivery
Delivery
Delivery

Download

2026-08-25 264
ASTMA512.pdf
PDF
View More
2026-08-25 290
ASTMA519.pdf
PDF
View More
2026-08-25 231
DIN2391-1.pdf
PDF
View More
2026-08-25 296
DIN2391-2.pdf
PDF
View More
2026-08-25 224
EN10305-1.pdf
PDF
View More
2026-08-25 295
Hollow Bar Specifications.pdf
PDF
View More