Changzhou Chengxin Metal Products Co., Ltd
Email
Follow
Search
Home » ASTM A519 SAE 1020 AISI 1020 Cold Drawn Seamless Carbon Steel Tube for Ingot Mold
ASTM A519 SAE 1020 AISI 1020 Cold Drawn Seamless Carbon Steel Tube for Ingot Mold
ASTM A519 SAE 1020 AISI 1020 Cold Drawn Seamless Carbon Steel Tube for Ingot Mold

ASTM A519 SAE 1020 AISI 1020 Cold Drawn Seamless Carbon Steel Tube for Ingot Mold

Ingot mold tube is a kind of cold drawn seamless tube with tight OD and ID tolerance and smooth surface condition.
Quantity:
Inquire

Product Description

1. Commodity Description: Ingot mold tube is a kind of cold drawn seamless tube with tight OD and ID tolerance and smooth surface condition.

2. Commodity: Cold drawn seamless steel tube for ingot mold

3. Standard specification: ASTM A519 SAE1020, SAE1026, SAE1045 or equivalent steel grade

 

4. Size range:

OD: upto 356mm
ID: upto 300mm
W.T: not limited

 

6. Manufacture method: Hydraulic cold drawn

7. Delivery Condition: As drawn / BKW / +LC

8. End finish: plain ends with square cuts, bevelled ends.

9. Standard export packing: Int & Ext oil coating. External packing by sreel racks or frames.

10. Customized packing or marking are available upon request.

 

Ingot Mold Tubes:

Packing for ingot mold tubes: bundle packing and steel racks

 

 

 

FAQ

1. MOQ: Generally Min Order Quantity can be 2-3 tons/size for tubes with OD below 250mm, and 10 tons/size for tubes with OD above 250mm. Sometimes, it depends on steel grade you need. If you need special grade like E410, E470 or alloy steel tube, MOQ should be 10 tons/size at least.

2. Delivery Time: Generally, our delivery time for honed tubes is around 40-60 days depending on the sizes and quantities. It will take us 15-30 days to get raw material. For example, if you need 3 tons of small size honed tubes 50mm*40mm with roughness of Ra0.25um max, it will take us at least 30 days to hone this size.

3. Warranty & Guarantee: Warranty & guarantee period is 6 months since we deliver the tubes, and we are not responsible for quality problem caused by wrong unloading or storage after shipment. We welcome customer’s inspection before shipment.

4. Payment Method: We accept payment method like T/T, L/C, or D/P, but it depends on our investigation about customers. We have a solution to evaluate the credit of customers from all over the world, and time and amount of D/P we can release is determined by the evaluation.

5. Quality Control: 90% of the tubes are made from hot rolled seamless pipes. So, quality of raw material determined quality of finished tubes. We purchase raw material from stable suppliers who are leading steel mills, and we inspect the raw material as per the specifications. During our production procedure, there is inspection and quality control in every stage.

 

Company Introduction

We are a manufacturer of cold drawn, cold rolled, and hydraulic cold drawn steel tubes with OD upto 356mm since 2002. Covering an area of about 32000M2, we have 12 standard workshops with 2 hydraulic cold drawing benches, 4 chain cold drawing benches, and 2 ERW mills. Our facilities covers all the production procedures from pickling, cold drawing, heat treating, saw cutting, straightening, inspection, packing to further machining & turning, cold drawing die fabrication, and equipment repairation & maintenance.

 

What We Offer

Quality Raw Material

We use high quality raw material from leading manufacturers.

Strict Quality Control

Strict quality control before, during and after production. Any quality dispute or problem will be immediately reported and handled internally.

Flexible Production Arrangment

To ensure both delivery time and customer experience.

Customization

In addition to steel tube we produce, we also provide services like OD machining, OD polishing, ID honing or skiving&roller burnishing, initial CNC turning.

Packing & delivery

We have established strict quality control circle covering raw material receipt, in-production inspection, and finished product control, and inspection&test records will be kept in our management system.

Packaging

For each piece of tube we delivered, Mill Test Certificate will be issued, and quality guarantee will be given. We give a period of 1-3 months for claim of quality dispute and problems after cargo receipt, depending on actual situation.
View More
Packaging
Delivery
Delivery
Delivery
Delivery

Download

2026-08-25 233
ASTMA512.pdf
PDF
View More
2026-08-25 220
ASTMA519.pdf
PDF
View More
2026-08-25 219
DIN2391-1.pdf
PDF
View More
2026-08-25 252
DIN2391-2.pdf
PDF
View More
2026-08-25 272
EN10305-1.pdf
PDF
View More
2026-08-25 252
Hollow Bar Specifications.pdf
PDF
View More